House construction report

Anyone can do a normal color session Part 3: Assembling the kitchen

The most difficult topic was probably the kitchen, because American kitchens are a bit old-fashioned in our eyes. We also don’t like the country house style, which is characterized by lots of framing, earth tones, scroll handles, etc. So modern house looking for modern kitchen, preferably high-gloss, but not white, because we already had a white kitchen in Germany. Even though the kitchen will be installed last, we felt early on that we should take care of it.

House construction report

Building a pool: with Infinity Edge & Spa

The time has finally come: the pool is being built. This is a highlight of the entire new build. After the excavator has completed the excavation with astonishing precision, reinforcing bars are laid according to the future shape of the pool. Then concrete is sprayed over it, which forms the so-called pool shell after solidification. Finally, the pool finish is applied to this shotcrete shell, a coating consisting of small stones, sometimes glass pieces and cement.

House construction report

Wallpaper on the wall brings beautiful living to life

Our grandchildren are probably wondering what wallpaper actually is. We are reviving this wall covering and bringing the beach, the Live Oaks and the vacation feeling into our home. We did the wallpapering ourselves – it wasn’t that easy. Making the right choice in particular took a lot of effort. Well done to anyone who can work with Photoshop here and can thus sinulate the individual rooms

House construction report

Painting work: Color in and around the house

If you think that professionals paint a whole house in two/three days, then unfortunately this does not apply to our “super painters”. The whole painting process took weeks. Why? Amateurs on the one hand, special requests on the other. But let’s start from the beginning:

House construction report

Exterior plastering: a house is getting dressed up

The plasterers arrived at the same time as the drywall builders, who first applied the exterior plaster. We originally wanted a smooth render to match the modern house. However, this would have cost an incredible USD 5,000 more. In hindsight, we learned that smooth exterior plastering is a major challenge for the often unskilled craftsmen, and the quality of the work can be correspondingly poor.

House construction report

Sanitary Installation: German Toilet not so easy

The plumbers were slightly overwhelmed by our requirements. They had never fitted a German wall-hung toilet set like this before and didn’t want to learn how to do it. So our builder took it into his own hands. He had never done it before either, so he did it wrong straight away. But more on that later in the build report.

Scroll to Top